I didn't get to the floor like I had hoped, but the tile is up, the client is thrilled, and I'm just a wee bit impressed with myself. My finger still hurts and has developed a disturbing bump/lump kind of thing that makes me think there is the mother of all blood blisters under there. I'm not sure what to do about it yet, so I am taking a wait and see approach. It doesn't hurt quite as bad as it did yesterday. Tired and going to bed. Maybe I'll have more exciting things to report tomorrow.
Showing posts with label tile. Show all posts
Showing posts with label tile. Show all posts
Thursday, January 8, 2009
Tile is up!!
I didn't get to the floor like I had hoped, but the tile is up, the client is thrilled, and I'm just a wee bit impressed with myself. My finger still hurts and has developed a disturbing bump/lump kind of thing that makes me think there is the mother of all blood blisters under there. I'm not sure what to do about it yet, so I am taking a wait and see approach. It doesn't hurt quite as bad as it did yesterday. Tired and going to bed. Maybe I'll have more exciting things to report tomorrow.
Monday, January 5, 2009
Oh dear
The official color of this tile and tub is called "seafoam green." It will go down in the annals of bad taste with "harvest gold" and "avacado."

This is what greeted me when I peeled back the plastic that had been duck-taped over it to prevent more leakage into the downstairs bathroom.
Yeah, it was pretty bad.
Then I started peeling stuff out of there and it looked like this:
I don't know if it shows really well in the photo, but the tiles were stuck to drywall. Not plywood, drywall. Not blueboard drywall, generally used for bathrooms, but cheap-ass 3/8 inch drywall.
On the wall with all the faucet bits, there were three horizontal boards that the stuff was nailed to. Not screwed, nailed. And they weren't two-bys, oh no. They were one-by-something-cheap and they were spaced nearly 30 inches apart. Yeah. really nice.
On the long wall, the drywall is covering up the rotted out beat up horsehair plaster and lath wall behind it. Look closely and you'll see the various layers of nastiness.
And finally, my lungs hurt just looking at the next picture. What you are seeing in the bottom horizontal piece of sheetrock peeled back at the left-hand corner to expose the fungus that had obviously been thriving between it and the plaster. Yes, I do have a mask. But it still makes my lungs ache to even look at it.

The red stuff in the hole? That's a kind of stiff paper air barrier that was put between the two-by-four wall studs (this is an exterior wall) and the plaster and lath. There is nothing between it and the exterior siding but air. That's right: no insulation. Oh, yeah. Nice stuff. There is some weird insulation kind of stuff on the outside of the wall studs but inside of the sheathing and clapboards. It looks like shredded newspaper or something contained in a brown paper pillow pack kind of thing. Very weird looking. I'll post that picture later. For now I am tired and tired and tired and tired. So I am going to bed. I've been to three meetings in 24 hours and am remarkable peaceful for a person who is so far from home, girlfriend and puppy and who discovered this morning that the floor next to this tub is also rotted and will have to be replaced. I'll go into more detail on that tomorrow. For now, here's a peek:

Now I am headed to bed. Tomorrow will be here very, very soon.
This is what greeted me when I peeled back the plastic that had been duck-taped over it to prevent more leakage into the downstairs bathroom.
Yeah, it was pretty bad.
Then I started peeling stuff out of there and it looked like this:
On the wall with all the faucet bits, there were three horizontal boards that the stuff was nailed to. Not screwed, nailed. And they weren't two-bys, oh no. They were one-by-something-cheap and they were spaced nearly 30 inches apart. Yeah. really nice.
On the long wall, the drywall is covering up the rotted out beat up horsehair plaster and lath wall behind it. Look closely and you'll see the various layers of nastiness.
And finally, my lungs hurt just looking at the next picture. What you are seeing in the bottom horizontal piece of sheetrock peeled back at the left-hand corner to expose the fungus that had obviously been thriving between it and the plaster. Yes, I do have a mask. But it still makes my lungs ache to even look at it.
The red stuff in the hole? That's a kind of stiff paper air barrier that was put between the two-by-four wall studs (this is an exterior wall) and the plaster and lath. There is nothing between it and the exterior siding but air. That's right: no insulation. Oh, yeah. Nice stuff. There is some weird insulation kind of stuff on the outside of the wall studs but inside of the sheathing and clapboards. It looks like shredded newspaper or something contained in a brown paper pillow pack kind of thing. Very weird looking. I'll post that picture later. For now I am tired and tired and tired and tired. So I am going to bed. I've been to three meetings in 24 hours and am remarkable peaceful for a person who is so far from home, girlfriend and puppy and who discovered this morning that the floor next to this tub is also rotted and will have to be replaced. I'll go into more detail on that tomorrow. For now, here's a peek:
Now I am headed to bed. Tomorrow will be here very, very soon.
Friday, December 5, 2008
Grout v. skin: Grout 1, skin 0
I don't know what the chemicals are that make up sanded grout, but they cannot be good. The skin on my hands is dry and cracked and rough and scuffed and it feels tight and I have already dosed it with super-lotion and it just drank it. Time for another dose, and it's only been an hour or so since the last one. Damn.
---
Honestly, my greatest strength is my confidence in myself.
Regrettably, my greatest weakness is also my confidence in myself.
Today took much longer and accomplished much less than I had hoped.
But the grout is done. Nearly two full boxes (seven pounds each) of sanded antique white grout have been installed in those nasty little spaces between the tiles. It took me 9. 5 hours to take out those miserable fucking rubber spacers, scrape down the excess adhesive, replace the one tile that tried to make a run for it, and apply grout (and wipe clean) to the space I am calling the phone booth. I spent far too many hours kneeling in the entrance to the shower stall, grout float in one hand, trowel in the other, leaned over in a way that offends both my back and my stomach muscles, trying to convince that loose wet sand to get into the cracks and stay there. Ouch.
---
Shortly after I arrived this morning, the owner came hustling into the little cabin where I've been working. "I've got a problem" he said. Uh-oh. That's never good.
Seems he was concerned about the pattern I had used on the back wall of the stall. It didn't match the other two walls and he wasn't sure he liked it. He feared that all of the toxic fumes had rendered me mad, that I had taken leave of my senses and just stuck the tiles up willy-nilly. When I explained how it was "an architectural feature" to hide the fact that the stall is wider at the top than the bottom and that it is because the cabin is just a little out of plumb, he was much relieved and decided he liked it after all.
Although, by the time I was done putting grout in those nasty little zig-zag seams, I was about ready to take leave of my senses.
The parts that were over the entrance to the stall were especially tricky. Pushing loose, wet sand into an overhead crack is not as easy as it sounds. And it doesn't sound easy at all. I had grout in my hair before I was done.
I must return on Monday to spray on the sealant and do the drywall and trim work. I'll bring my shop vac and clean up as much as possible as I collect my tools for the next job. We'll hope that day's work doesn't take more than I plan.
Wednesday, December 3, 2008
Tight quarters
I just tiled a phone booth.
No shit.
Actually, I think it is smaller than your standard phone booth. Certainly smaller than the Tardis.
This has got to be the world's smallest shower stall outside of a motor home. It measures barely 25 inches on a side inside. It is teeny. And the worst part?
I built it that way.
See, I've been working on a little cabin - one of those summer places you stay when you go on vacation. Nice little units. Nothing big, but with a smell of salt air and quiet surroundings. Just what you want on vacation in Maine. View of the cove and everything. OK. So the old shower was one of those free-standing units made of semi-rigid plastic frame and flexible vinyl walls. Icky. Well, the base was just so utterly stained as to be simply useless, so the owners decided to rip it out. Can't blame them a bit. Only the base was about 30 by 30 inches. No problem, says they, and they run up to the big orange box and come back with the smallest shower stall in the place. Only it's 32 inches on a side. Uh-oh. 32 inches means we're into the toilet tank on one side (the tank is already against the far wall) and an inch and a half into the glass of the bathroom window. Oh dear.
Well we stood around and scratched our heads for a while and decided that we'd have to fabricate something to fit the old footprint of the shower stall. Fine. I order some lumber and some plumbing parts and some wonder board. I go to the hardware store and pick up lots of bits and pieces. I come back and get to work. The first thing I did was take out the toilet because it was simply in the way and there was no room to move. Here's what I started with:
So here is what I did first. I framed in the square-ish box that will become the shower stall and ran the appropriate plastic drain bits down through the existing hole.
I don't know if you can tell from this picture, but there are a TON of shims under the entrance edge (near the bottle of propane). In order to make this level, I had to build up fully 7/8 inch. And this was after jacking and supporting things underneath (see below). This was a crazy thing.
I topped it off with a piece of 3/4 inch plywood that almost lined up with the plumbing stuff.
I did get the pipes braced so that they lined up with the hole and everything there was good. Before I went any further, though, I thought it would be wise to reinforce that section of the building before I installed a couple hundred pounds of cement board and tile. Under I went.
Now these cottages, and there are thousands of them up and down the coast of Maine and around every lake and pond inland, are up on blocks. They do not have a regular foundation. Cement blocks and chunks of wood hold them up at the corners and in the middle, usually, and when the spring comes they need to be jacked and leveled. My young friend J and I did just that at this place earlier this year. A very muddy, nasty job it was.
Here is a picture out the bathroom window at the cottage next door. Note the lattice at the ground level. This covers up the blocks and posts that the cottage is perched upon and where I must go to deal with plumbing and supports. Yeah. cozy.
So under I went to put in some extra blocks and supports. While I was there I pulled the plug on the trap for the shower. If I'm going to be rinsing grout, it needs to have a place to go where it won't freeze and break pipes. These cabins are not winterized and the water is turned off and the pipes drained before winter. This also means I need to carry warm water from the office/residence to clean tools, etc. Lots of fun. Oh well. Could be worse. The cabin has a heater and the power is on, so I can bring my radio and plug in my tools.
After I got the wood floor finished, I set myself up to play with some copper pipes. I do love copper. I love the feel of the metal, I love the shine of the polished surface, I love watching the flux boil out of a joint and the solder flowing in. Science is so damned cool. So I fiddled around underneath the cabin and ran the pipes up through the floor. I put in a couple of shut-off valves for good keeping, then ran the pipes up to the shower mixer gizmo (the thing with the knob that makes the water come out onto your person) which I had mounted to a cross-member. It got a little warm in there, and I charred the cross-member a bit, but nothing I couldn't put out. The joint should hold, though.
As sometimes happens when soldering pipes, there is a little support required to really snug the joints together. That's what the two-by-four is about here. Notice the shiny stuff on the top of the board and the same kind of shiny stuff on the thighs of my Carharts. Let's just say I am very, very glad for the double thickness of denim. I felt the splashes when the molten solder hit my legs, but not the painful burns that would have happened in lesser pants.
So anyway, I get the thing boxed in and the pipes figured out. I make the floor out of wonder board:
I used my Dremel to carve out the sloped sides of the drain hole to accommodate the floor drain for the shower.
The little board looking things? Cedar shingles. 3/8 inch thick at the thickest part and thin down to nothing. The pink looking stuff in the seams and screw holes? That would be bondo. The shiny stuff in the drain hole? That would be duct tape. I have lived in Maine long enough to value the myriad of uses for each.
So then I got the wonder board up on all the walls. Nasty stuff. Have to use an abrasive wheel for masonry on my good circular saw. Dust gets everywhere. Blowing gray shit out of my nose for days afterward. Bleah.
I had to line the bottom of the pan with a special vinyl membrane that had to be glued down with some of the most toxic crap I have ever used. I put this stuff down on a Monday and was sick all day Tuesday. Yuckers. But it won't come up, and it won't leak. After I trimmed the gasket thing, I used bondo to build up the wonder board to make a gradual seam, then I covered it with a four-inch wide band of fiberglass cloth secured with fiberglass resin. Come to think of it, any or all of those things might have contributed to that two-day headache and sore throat. Oh well.
The drain hole looks sketchy as hell here, but have faith. It cleans up OK, even if I did sacrifice millions of brain cells to do it.
The tile for the floor was about the worst part of the job. We had mats of tile that I tried to arrange around the seams in the floor so as to work with the slopes I had built in. It took a lot of cutting and snipping with tile nippers, but I think the result looked pretty good if I do say so.
So today I went in to finish tiling. I wanted to let the floor rest at least overnight before I put anything on the walls. Here's how it went together today. I started on the left wall, half at a time:
Here's what it looks like all the way done:
In an effort to keep tiles stuck to the overhead portion of the shower entrance, I devised this somewhat dubious system of clamps and braces. The two-by-fours each have scrap tile parts stuck to them to act as spacers to hold the tiles in without squashing the little plastic spacer bits between the tiles. Take a peek. If you're careful, you might see me in the mirror, taking the picture over my own shoulder:
One thing missing: Shower spigot!
As it turns out, this shower is going to have the spigot spray part mounted to a piece of copper tube that comes out of the top of the wall (through the trim and everything). I liked this idea especially because it meant I did not have to cut more tiles.
I'll have some more pictures when I get the drywall and trim up and the grout in and set, but for now I need to let it rest for at least 24 hours before I try anything else.
No philosophical diatribes today, I fear. Just ceramic tile in a very small shower.